Sengkang West has undergone remarkable transformation over the last 5 years.  Much of these changes have been captured in the Ang Mo Kio – Yio Chu Kang Town Council Town Improvement Exhibition which was officially launched on 20th Feb 2011 by Prime Minister Lee Hsien Loong at the new AMK 3G Centre next to Cheng San CC.  This was followed by the roving exhibitions at the various community clubs in Ang Mo Kio – Yio Chu Kang.  The Sengkang exhibits are exhibited at the Anchorvale Community club from 12th – 13th March 2011.

Upcoming projects in Sengkang West to be undertaken by the Town Council include the following:

   1) Fitness Corner @ open area near Block 305B Anchorvale Link

   2) Covered Linkways at :

       a) Block 306C linking LTA’s linkway from Anchor Green Primary School to bus stop at Anchorvale Drive

      b) Block 403A to bus stop at Fernvale Lane

      c) Between Block 312 MSCP and 312B Anchorvale Lane

  3) Replacement of roof shelters at

      a) Block 318D and 318 MSCP at Anchorvale Link

     b) Block 313B and 314B at Anchorvale Road

     c) Block 406A and 406 MSCP at Fernvale Road

In addition, there will be 2 new Primary schools in Anchorvale and Fernvale respectively with construction expected to be completed in late 2012.  These are located at the junction of Sengkang East Way and Anchovale Link (opposite Blocks 318A and 318B) ; and along Fernvale Road (opposite Blocks 441C and 441D).  Upgrading works have also started in Nan Chiau Primary School.

To add to the vibrancy of Sengkang West, the grassroots organisation is currently looking into setting up a water activity centre at the Punggol reservoir (next to Anchorvale CC), providing recreational water sports such as canoeing and dragon boating.

Surrounding developments at Greenwich V (Seletar) and the Seletar Aviation Hub (Jalan Kayu) will also enhance the amenities and facilities for residents of Sengkang West.